Davis St House
The Davis St House began as a recommendation, and became an exercise in fitting a smaller home carefully to both its property and the way its owner wanted to live. One requirement shaped the design from the beginning: the front entrance needed to directly address the entrance to the site. I carried the project from the first site meeting through iterations, construction documents, a jurisdiction's corrections, and permitting. It is under construction in College Place, Washington — after the carport, the second project here to leave the page, and the first whole house.
The owner was looking to downsize, and from the first site meeting the project became an exercise in fitting a smaller home carefully to both the property and the way they wanted to live. I began by documenting the site and existing conditions, then met with the owner to understand what they wanted from the house.
One requirement shaped the design from the beginning: the front entrance needed to directly address the entrance to the site. I developed several plan iterations around that relationship, brought them back to the owner, and continued refining the selected scheme until the layout felt right.
The house sits in a different jurisdiction from the projects I had worked on before, and the permit process introduced a new set of city requirements. During the construction document set I realized I had overlooked the required five-foot setbacks on each side of the house — the original floor plan extended beyond those limits. I had to return to the plan and revise the layout so the house fit within the allowable building area while still maintaining the spaces and relationships the owner wanted.
What initially looked like a straightforward site plan became more complicated when coordination with the builder revealed that the house needed to be pushed farther back on the property, with the garage set back even more. The change created a clearer path for bringing water and power onto the site during construction, and more room for vehicles to pull in and out of the garage. I revised the design around these constraints without losing the relationship between the house, its entrance, and the site that had driven the original plan.
By this point I had also become familiar with the residential energy code and could contribute beyond documenting the design. I reviewed the available energy credits and recommended options that could improve the home’s performance without adding unnecessary cost for the owner.
It was one of the first projects where my understanding of code began to influence the decisions I was recommending, rather than only the drawings I was producing.
I carried the project from the initial site visit and client conversations through design iterations, construction documents, site revisions, energy-code coordination, and permitting. Each stage added another constraint, and each constraint required the design to adjust without losing the ideas that had shaped it in the first place.
The Davis St House has its permits and is now under construction — a project that began as a conversation about downsizing, becoming a house.